Custom Booth Build Tips (Read Before Submission)
: custom booths must submit design drawings, qualification documents and construction plans to the venue for approval before the show; incomplete or non-compliant materials may require rectification or even bar entry;
Height limits
- venue submission approval: booth build height must meet the venue's current rules; double-deck booths need separate approval and structural safety certification;
- Fire safety: materials must meet fire-resistance requirements, fire facilities must not be blocked and evacuation routes kept clear;
- Electrical standards: wiring must be installed by qualified contractors and declared per the venue's power application process;
- Move-in & move-out: follow the venue's move-in/out schedule strictly; overtime may incur extra charges.
- The height limits and approval requirements of the 28 venues above differ (e.g. Poly World Trade Center has a 6 m build limit, Tanzhou a 10 t/m² floor load, and the Canton Fair Complex a 4.5 m single-deck custom limit). Refer to each venue's current Custom Build Management Regulations; submission documents are handled by Qiaojiang, see . Exhibiting at any of these venues?
Get a build plan for your venue, or first see our Service Processprojects delivered at these venuesContact UsWant a booth design with a strong visual impact?cases delivered at these venues。